Installation Time
(approx) 30 Minutes
Difficulty Level:
Simple installation for anyone.
FREE 1 to 3-Day Delivery on Orders $119+ Details
$152.99 each
Saved - View your saved items
We're sorry. We couldn't save this product at this time.
Features, Description, Q&A, Specs & Installation
High Strength Functional Design. The PPE 3-Inch Down-Pipe is made with stainless steel for maximum resistance to rust and corrosion, also it comes with a woven titanium sleeve to help reduce engine bay temperatures. Best of all, the three-inch main piping diameter ensures unrestricted flow and optimal performance.
Warranty. This PPE 3-Inch Down-Pipe is covered with a 1-year limited warranty against damages on materials and craftsmanship.
Application. A PPE 3-Inch Down-Pipe is constructed to be precisely suitable with 2011-2014 6.6L Silverado 2500 HDs.
Fitment:
PPE 117000600
CA Residents: WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Installation Info
Installation Time
(approx) 30 Minutes
Difficulty Level:
Simple installation for anyone.
What's in the Box