Talk to a Ram 1500 Sales Tech
1-888-706-1096
M-F 8:30A-11P, Sat-Sun 8:30A-9P
Win $4,000! Enter Daily

How to Install Tuffy Multi-Point Tie Down Rails on your Dodge Ram

Tools Required
  • Electric drill
  • 3/8” Drill bit
  • Marker or pencil
  • Silicone sealant (Recommended)
  • ½” Socket and ratchet
  • ½” Wrench
American Muscle
Shop Parts in this Guide

Please read and fill out the enclosed warranty registration card to activate your warranty.

PARTS CHECKLIST


PLEASE READ ALL INSTRUCTIONS THOROUGHLY BEFORE STARTING INSTALLATION.

1. Choose a strong surface for mounting the rails then mark and drill the holes and fasten them with the illustrated hardware.


Best Sellers