Installation Time
(approx) 3 Hours
Difficulty Level:
Light to Moderate mechanical skill required.
Guaranteed 12/24 Delivery Still Available see item page for details! available on most items - Details
$616.50 kit
Saved - View your saved items
We're sorry. We couldn't save this product at this time.
or use
Features, Description, Q&A, Specs & Installation
Maximum Power and Torque. The South Bend Stage 2 Drag Ceramic Clutch Kit is a game-changer for your 1997-2003 4.2L, 4.6L F-150. This kit is meticulously engineered to deliver maximum power and torque handling capabilities, transforming your F-150 into a high-performance beast. Whether you're dominating the drag strip, conquering off-road terrains, or simply seeking exhilarating performance on the street, this clutch kit is the ultimate solution.
Defying the Heat. The ceramic disc material at the heart of this South Bend Clutch Stage 2 Drag Ceramic Clutch Kit is renowned for its exceptional heat resistance and friction. This advanced material can withstand the intense heat generated during high-performance driving, preventing heat fade and ensuring consistent clutch performance. The result is quicker shift times, reduced clutch slippage, and improved overall drivability.
Harnessing Power. This South Bend Clutch Stage 2 Drag Ceramic Clutch Kit is designed to handle significantly increased torque output, allowing you to unleash the full potential of your engine's power. Whether you're upgrading your engine or adding performance modifications, this clutch kit can handle the extra power and torque without compromising reliability.
Installation. Putting this South Bend Clutch Stage 2 Drag Ceramic Clutch Kit on your F-150 takes 3 hours to install.
Warranty. There is a 12-month or 12,000-mile warranty on this product.
Application. The South Bend Clutch Stage 2 Drag Ceramic Clutch Kit fits 1997-2003 4.2L, 4.6L F-150 models.
Fitment:
South Bend Clutch K07130NSA-HD-B
CA Residents: WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Installation Info
Installation Time
(approx) 3 Hours
Difficulty Level:
Light to Moderate mechanical skill required.
What's in the Box